Project Title: High-Performance Computing for Wind Energy (HPCWE)
Timescale: 2019-2021 (2 years)
Funder: EC H2020

Project Title: Farming the Environment into the Grid: Big data in Offshore Wind (FENGBO-WIND)
Timescale: 2017-2020 (3 years)
Funder: EPSRC

Project Title: Maximizing Wind Farm Aerodynamic Resource via Advanced Modelling (MAXFARM)
Timescale: 2015-2019 (3.5 years)
Funder: EPSRC

Project Title: Control of flexible structures and fluid-structure interactions (CONFLEX)
Timescale: 2017-2021 (3.5 years)
Funder: EC Marie Curie

Project Title: A new simulation and optimisation platform for marine technology
Timescale: 2015-2018 (3.5 years)
Funder: EPSRC

Project Title: PRISM: Platform for Research In Simulation Methods
Timescale: 2018-2023 (5 years)
Funder: EPSRC

Project Title: Wind Farm Dynamic Equivalencing
Timescale: 2016—2019
Funder: GE Grid Solutions UK Ltd

Project Title: Technical Investigation of Sub-synchronous Interaction between Wind Turbine Generators and Series capacitors
Timescale: 2014—2015
Funder: National Grid UK

Project Title: Aggregated Wind Farm Dynamic Interconnection Model and Analysis Involving Type-IV Turbines
Timescale: 2015-2016
Funder: ALSTOM UK

Project Title: Aggregated Wind Farm Dynamic Interconnection Model and Analysis Involving Type-III Turbines
Timescale: 2014-2015
Funder: ALSTOM UK

Project Title: Investigation of Synchronisation Problem of Offshore Wind Farm with the Grid
Timescale: 2013-2014
Funder: ALSTOM UK

Project Title: Rationalising offshore wind-turbine pile design and assurance in difficult ground
Timescale: 2014-2017
Funder: UK Innovate, SPR/Iberdrola & GCG (Geotechnical Consulting Group)

Project Title: ALPACA: Axial-Lateral Pile Analysis for Chalk Applying multi-scale field and laboratory testing
Timescale: 2017-2020
Funder: EPSRC (EP/P033091/1) , Atkins, Cathie Associates, DNVGL, ØRSTED, Fugro, GCG, Iberdrola/SPR, Innogy, LEMS, Siemens

Project Title: Small Scale pile tests in Chalk
Timescale: 2017-2018
Funder: ICE Research & Development fund

Project Title: PISA: Pile Soil Analysis
Timescale: 2013-2016
Funder: UK Department for Energy and Climate Change (DECC), Ørsted, Alstom Wind, E.ON, EDF, Iberdrola, innogy, SSE, Statkraft, Statoil, Van Oord & Vattenfall

Project Title: PISA2: Pile Soil Analysis
Timescale: 2017-2018
Funder: UK Department for Energy and Climate Change (DECC), Ørsted, Alstom Wind, E.ON, EDF, Iberdrola, innogy, SSE, Statkraft, Statoil, Van Oord & Vattenfall

Project Title: Temperature-controlled interface shear box testing of offshore sediments
Timescale: 2017-date
Funder: Imperial College funding