Imperial College London

ProfessorArnabMajumdar

Faculty of EngineeringDepartment of Civil and Environmental Engineering

Professor of Transport Risk and Safety
 
 
 
//

Contact

 

+44 (0)20 7594 6037a.majumdar

 
 
//

Assistant

 

Ms Maya Mistry +44 (0)20 7594 6100

 
//

Location

 

604Skempton BuildingSouth Kensington Campus

//

Summary

 

Publications

Citation

BibTex format

@inproceedings{Tobaruela:2013,
author = {Tobaruela, G and Majumdar, A and Ochieng, WY and Schuster, W and Hendrickx, P},
title = {Enhancing Cost-Efficiency and Reducing Capacity Shortages: Strategic Planning and Dynamic Shift Management},
year = {2013}
}

RIS format (EndNote, RefMan)

TY  - CPAPER
AB - This paper analyses the relationship between capacity and cost-efficiency at an en-route Air Traffic Control Centre level. It develops a set of cost-efficiency metrics to describe the centre planning process, and compares these results to cost- efficiency values. In order to understand the effect of the new tools and procedures implemented at the centre on its cost- efficiency, statistical analysis of the operational data before and after implementation is undertaken. The results show that the introduction of a dynamic shift management enabled by staff planning automation tools, along with a flexible roster and an appropriate planning process can simultaneously enhance capacity and cost-efficiency. These improvements are mapped to the SESAR Operational Improvements, to assess the feasibility of the programme to achieve its capacity and cost-efficiency improvement targets. A set of recommendations is developed.
AU - Tobaruela,G
AU - Majumdar,A
AU - Ochieng,WY
AU - Schuster,W
AU - Hendrickx,P
PY - 2013///
TI - Enhancing Cost-Efficiency and Reducing Capacity Shortages: Strategic Planning and Dynamic Shift Management
ER -