Skip to main content View accessibility support page
  • Study
  • Research
  • Faculties
  • News
  • Events
  • About
  • Get involved
  • Giving
  • Shop Imperial
  • Search

Website navigation

Skip to section navigation

Global site navigation

  • Study
    • Course search
    • Apply
    • Fees and funding
    • Student life
    • Visit
    • Help centre
    • Request info
    • International students
    • Executive education
    • Summer schools
  • Research
  • Faculties
    • Faculty of Engineering
    • Faculty of Medicine
    • Faculty of Natural Sciences
    • Imperial Business School
    • Administrative and support services
  • News
    • News
    • Imperial Stories
    • Imperial Magazine
  • Events
    • What's on
    • Great Exhibition Road Festival
    • Imperial Lates
    • Graduation
  • About
    • President
    • Provost and Deputy President
    • Council
    • Imperial Strategy
    • Imperial Global
    • Sustainable Imperial
    • Schools of Convergence Science
    • Governance
    • Campuses
    • Our academics
    • Jobs at Imperial
  • Get involved
    • Giving
    • Schools outreach
    • Imperial Global Summer School
    • Societal engagement
    • Volunteering and outreach
    • Women at Imperial
  • Giving
  • Shop Imperial

User links navigation

  • For staff
  • Current students
  • Imperial for business
  • For schools
  • Alumni
Administration and support services

Capital Projects navigation

  • About us
    • Project Delivery
    • Engineering Team
    • Health and safety
  • Approved suppliers
  • Project procedures
    • Project stages
    • Project processes
      • Projects Delivery
        • Set up project file (Stage 0)
        • Risk Management (Stages 0 to 6)
        • Programme (Stages 0 to 5)
        • Project Execution Plan (PEP) (Stages 1 to 6)
        • Value Management (Stages 1 to 6)
        • Project reporting (Stages 1 to 7)
        • Scope of services review meeting (Stages 2 to 4)
        • Handover strategy (Stages 2 to 5)
        • Project change (Stages 2 to 6)
        • Produce project factsheet (Stage 4)
        • Risk workshop with contractor (Stage 4)
        • Client site handover (Stage 4)
        • Record document strategy (Stage 4)
        • AICW (Stage 4)
        • Valuation (Stages 4 and 5)
        • Handover (Stage 6)
        • Project close out (Stages 6 and 7)
        • Project board
      • Evaluation and approval
        • Client brief (Stage 0)
        • Project feasibility (Stage 0)
        • Estates Committee Meeting (ECM) (Stages 0, 1 and 4)
        • Project Initiation Document (Stage 1)
        • Project board approval (Stages 1 to 4)
        • TAG/ERM (Stages 1 to 4)
        • User presentation (Stages 1 to 4)
        • Record of handover (Stage 6)
        • Suppliers performance review (Stage 7)
        • Post Project Review (Stage 7)
        • Pre-feasibility (Stage 0)
      • Design Management
        • Develop design brief (Stages 0 to 4)
        • Environmental and sustainability assessment (Stages 0 to 7)
        • Prepare Stage 1 report - feasibility study (Stage 1)
        • Town planning (Stages 1 to 4)
        • Project investigations/surveys (Stages 1 to 5)
        • Licences and agreements (Stage 2)
        • Prepare Stage 2 report - concept design (Stage 2)
        • BEMS design (Stages 3 to 5)
        • NEC Supervisor duties (Stages 3 to 6)
        • Prepare Stage 3 report - developed design (Stage 3)
        • Prepare Stage 4 report - technical design (Stage 4)
        • Record document delivery (Stages 5 and 6)
        • Construction and fabrication drawings (Stage 5)
        • Testing and commissioning (Stage 6)
        • Monitor and complete defects (Stage 7)
        • Post occupancy evaluation (Stage 7)
        • Design Stage reviews
      • Cost Management
        • Prefeasibility estimate (Stage 0)
        • Budget administration (Stages 1 to 7)
        • Feasibility cost estimate (Stage 1)
        • Establish VAT and insurance (Stage 1)
        • Cost plan (Stages 2 to 3)
        • Cost reporting (Stages 4 to 6)
        • Valuations (Stages 4 and 5)
        • Post take over cost management (Stage 7)
      • Procurement Management
        • Filing consultant tender and contract documents (Stage 0)
        • Outline procurement strategy (Stages 0 and 1)
        • Design Team procurement (Stages 0 to 4)
        • Main contract - PCSA (Stage 2)
        • Two Stage tender (Stages 2 and 3)
        • Insurances (Stages 2 to 4)
        • Single Stage tender (Stage 3)
        • Novation (Stage 4)
        • File contractor tender and contract documents (Stage 4)
        • Sub-contractor review (Stage 4)
        • Main contract - NEC (Stage 4)
      • Health and safety
        • Principal Designer (Stages 0 to 6)
        • Sustainable construction (Stages 1 to 6)
        • Health, safety and environmental assessment (Stages 1 to 3)
        • F10 notification (Stages 1 and 3)
        • Induction (Stages 1 to 3)
        • Pre-construction information (Stages 1 to 4)
        • Asbestos Management (Stages 1 to 6)
        • CDM notification (Stage 2)
        • Heath and safety file (Stages 3 and 6)
        • Decontamination certificate (Stage 4)
        • Construction phase plan (Stage 4)
        • Client safety induction (Stage 4)
        • Accident and incident reporting (Stage 5)
        • Site monitoring (Stage 5)
    • Application and review
    • College roles
    • Project Roles
  • Space and Building Information
    • Space Database
    • Building Information
    • Architectural Standards Library
      • Lecture Theatres
        • Architectural Standards
          • Flooring Products
          • Ceiling Products
          • Wall Products
          • Seating Products
      • Offices
        • Architectural Standards
      • Student Accommodation
        • Architectural Standards
      • Laboratories
        • Architectural Standards
          • Flooring Products
          • Ceiling Products
          • Lab Benches
          • Fume Cupboards
          • Wall Products
        • Engineering
      • Common Spaces
        • Architectural Standards
      • Signage
        • Signage
    • Estates Records
  • Resources
    • Forms
    • College standards
      • Architectural standards
    • Guides and policies
  • Construction projects

In this section

  • Capital Projects
  • General Safety Flooring
  • Wet Environment
Capital Projects
  • Imperial Home
  • Administration and support services
  • Capital Projects
  • Resources
  • College standards
  • Architectural standards
  • Finishing Flooring M50
  • Safety Flooring

Safety Flooring

Finishing Flooring M50
  • General Safety Flooring
  • Wet Environment

Background information - Vinyl and Safety Flooring

Altro Aquarius

Altro Reliance 25

Altro Superema

Altro Walkway 20

Altro Wood Safety

Milliken Change Agent LVT

Milliken First Call ICL

Milliken Original Collection LVT

Polyflor Polysafe Apex

Polyflor Polysafe Hydro Evolve

Polyflor Polysafe Quattro

Polyflor Polysafe Quicklay PUR

Polyflor Polysafe Standard PUR

Polyflor Polysafe Stone FX PUR

Polyflor Polysafe Verona PUR part 2 -Pure

Polyflor Polysafe Vogue Ultra PUR

Polyflor Polysafe Wood FX Acoustix PUR

Polyflor Polysafe Wood FX PUR

Gerflor Safety Flooring-Tarasafe Ultra

Gerflor Safety Flooring- Tarasafe Ultra H2O

Gerflor Safety Flooring - Tarasafe Impression Mineral

 

Wet enviroment safety flooring

Useful Links

Popular links

  • Blackboard
  • Contact the Service Desk
  • Jobs
  • Library services
  • Outlook email online

Faculties

  • Engineering
  • Medicine
  • Natural Sciences
  • Imperial Business School

Directories

  • Admin and support services
  • Networks and Centres
  • Research groups
  • Search all staff

Partners

  • Imperial College Academic Health Science Centre
  • Imperial College Health Partners
  • Imperial College Healthcare NHS Trust
  • Imperial Consultants

College Information

Imperial College London

Address

Imperial College London
South Kensington Campus
London SW7 2AZ, UK
tel: +44 (0)20 7589 5111

Facebook X, formerly known as Twitter YouTube LinkedIn Instagram TikTok TikTok

Site Information

  • Sitemap
  • Accessibility
  • Modern slavery statement
  • Privacy notice
  • Use of cookies
  • Report incorrect content
  • Log in

© 2025 Imperial College London