Skip to main content View accessibility support page
  • Study
  • Research
  • Faculties
  • News and events
  • About
  • Get involved
  • Giving
  • Search

Website navigation

Skip to section navigation

Global site navigation

  • Study
    • Course search
    • Apply
    • Fees and funding
    • Student life
    • Visit
    • Help centre
    • Request info
    • International students
    • Executive education
    • Summer schools
  • Research
  • Faculties
    • Faculty of Engineering
    • Faculty of Medicine
    • Faculty of Natural Sciences
    • Imperial Business School
    • Administrative and support services
  • News and events
    • News
    • What's on
    • Imperial Stories
    • Great Exhibition Road Festival
    • Imperial Magazine
    • Imperial Lates
    • Graduation
  • About
    • President
    • Provost
    • Imperial Strategy
    • Academic Strategy
    • Imperial Global
    • Sustainable Imperial
    • Governance
    • Campuses
    • Our academics
    • Jobs at Imperial
  • Get involved
    • Giving
    • Schools outreach
    • Imperial Global Summer School
    • Societal engagement
    • Volunteering and outreach
    • Women at Imperial
  • Giving

User links navigation

  • For staff
  • Current students
  • Imperial for business
  • For schools
  • Alumni
Administration and support services

Capital Projects navigation

  • About us
    • Project Management
    • Engineering Team
    • Health and safety
  • Approved suppliers
  • Project procedures
    • Project stages
    • Project processes
      • Projects Delivery
        • Set up project file (Stage 0)
        • Risk Management (Stages 0 to 6)
        • Programme (Stages 0 to 5)
        • Project Execution Plan (PEP) (Stages 1 to 6)
        • Value Management (Stages 1 to 6)
        • Project reporting (Stages 1 to 7)
        • Scope of services review meeting (Stages 2 to 4)
        • Handover strategy (Stages 2 to 5)
        • Project change (Stages 2 to 6)
        • Produce project factsheet (Stage 4)
        • Risk workshop with contractor (Stage 4)
        • Client site handover (Stage 4)
        • Record document strategy (Stage 4)
        • AICW (Stage 4)
        • Valuation (Stages 4 and 5)
        • Handover (Stage 6)
        • Project close out (Stages 6 and 7)
        • Project board
      • Evaluation and approval
        • Client brief (Stage 0)
        • Project feasibility (Stage 0)
        • Estates Committee Meeting (ECM) (Stages 0, 1 and 4)
        • Project Initiation Document (Stage 1)
        • Project board approval (Stages 1 to 4)
        • TAG/ERM (Stages 1 to 4)
        • User presentation (Stages 1 to 4)
        • Record of handover (Stage 6)
        • Suppliers performance review (Stage 7)
        • Post Project Review (Stage 7)
        • Pre-feasibility (Stage 0)
      • Design Management
        • Develop design brief (Stages 0 to 4)
        • Environmental and sustainability assessment (Stages 0 to 7)
        • Prepare Stage 1 report - feasibility study (Stage 1)
        • Town planning (Stages 1 to 4)
        • Project investigations/surveys (Stages 1 to 5)
        • Licences and agreements (Stage 2)
        • Prepare Stage 2 report - concept design (Stage 2)
        • BEMS design (Stages 3 to 5)
        • NEC Supervisor duties (Stages 3 to 6)
        • Prepare Stage 3 report - developed design (Stage 3)
        • Prepare Stage 4 report - technical design (Stage 4)
        • Record document delivery (Stages 5 and 6)
        • Construction and fabrication drawings (Stage 5)
        • Testing and commissioning (Stage 6)
        • Monitor and complete defects (Stage 7)
        • Post occupancy evaluation (Stage 7)
        • Design Stage reviews
      • Cost Management
        • Prefeasibility estimate (Stage 0)
        • Budget administration (Stages 1 to 7)
        • Feasibility cost estimate (Stage 1)
        • Establish VAT and insurance (Stage 1)
        • Cost plan (Stages 2 to 3)
        • Cost reporting (Stages 4 to 6)
        • Valuations (Stages 4 and 5)
        • Post take over cost management (Stage 7)
      • Procurement Management
        • Filing consultant tender and contract documents (Stage 0)
        • Outline procurement strategy (Stages 0 and 1)
        • Design Team procurement (Stages 0 to 4)
        • Main contract - PCSA (Stage 2)
        • Two Stage tender (Stages 2 and 3)
        • Insurances (Stages 2 to 4)
        • Single Stage tender (Stage 3)
        • Novation (Stage 4)
        • File contractor tender and contract documents (Stage 4)
        • Sub-contractor review (Stage 4)
        • Main contract - NEC (Stage 4)
      • Health and safety
        • Principal Designer (Stages 0 to 6)
        • Sustainable construction (Stages 1 to 6)
        • Health, safety and environmental assessment (Stages 1 to 3)
        • F10 notification (Stages 1 and 3)
        • Induction (Stages 1 to 3)
        • Pre-construction information (Stages 1 to 4)
        • Asbestos Management (Stages 1 to 6)
        • CDM notification (Stage 2)
        • Heath and safety file (Stages 3 and 6)
        • Decontamination certificate (Stage 4)
        • Construction phase plan (Stage 4)
        • Client safety induction (Stage 4)
        • Accident and incident reporting (Stage 5)
        • Site monitoring (Stage 5)
    • Application and review
    • College roles
  • Space and Building Information
    • Space database
      • VideoPlaylist
        • Playlist 1
    • Building Information
    • Architectural Standards Library
      • Lecture Theatres
        • Architectural Standards
          • Flooring Products
          • Ceiling Products
          • Wall Products
          • Seating Products
      • Offices
        • Architectural Standards
      • Student Accommodation
        • Architectural Standards
      • Laboratories
        • Architectural Standards
          • Flooring Products
          • Ceiling Products
          • Lab Benches
          • Fume Cupboards
          • Wall Products
        • Engineering
      • Common Spaces
        • Architectural Standards
      • Signage
        • Signage
    • Estates Records
  • Resources
    • Forms
    • College standards
      • Architectural standards
    • Guides and policies
  • Construction projects
    • Current projects
    • Completed projects
      • Michael Uren Building
      • I-XHUB White City Campus
      • Reynolds Bar Charing Cross
      • ACEX Lecture Theatre
      • Multi-disciplinary Labs
    • Past projects

In this section

  • Capital Projects
Capital Projects
  • Imperial Home
  • Administration and support services
  • Capital Projects
  • Resources
  • College standards
  • Architectural standards
  • Finishing Ceilings K13

Finishing Ceilings K13

Architectural standards

Armstron-Bioguard-acoustic-2018 (003)

Armstrong-Biobuard-plain-2018 (003)

Armstrong-Microlook-8-2018

Armstrong-Optima-2018

Armstrong-ultima+-2018

Armstrongultima+Open Plan 2018

SAS Ceiling 330

SAS Ceilings K40 System 150 Antimicrobial

SAS SYSTEM 120

SAS SYSTEM 130 Lay in Grid Metal Ceiling on Alugrid

SAS SYSTEM 130 on either 15mm or 24mm flat T-grid

SAS system 150 Concealed Grid Hinge

 

 

Useful Links

Popular links

  • Blackboard
  • Contact the Service Desk
  • Jobs
  • Library services
  • Outlook email online

Faculties

  • Engineering
  • Medicine
  • Natural Sciences
  • Imperial Business School

Directories

  • Admin and support services
  • Networks and Centres
  • Research groups
  • Search all staff

Partners

  • Imperial College Academic Health Science Centre
  • Imperial College Health Partners
  • Imperial College Healthcare NHS Trust
  • Imperial Consultants

College Information

Imperial College London

Address

Imperial College London
South Kensington Campus
London SW7 2AZ, UK
tel: +44 (0)20 7589 5111

Facebook X, formerly known as Twitter YouTube LinkedIn Instagram TikTok TikTok

Site Information

  • Sitemap
  • Accessibility
  • Modern slavery statement
  • Privacy notice
  • Use of cookies
  • Report incorrect content
  • Log in

© 2025 Imperial College London