Skip to main content View accessibility support page
  • Study
  • Research
  • Faculties
  • News and events
  • About
  • Get involved
  • Giving
  • Search

Website navigation

Skip to section navigation

Global site navigation

  • Study
    • Course search
    • Apply
    • Fees and funding
    • Student life
    • Visit
    • Help centre
    • Request info
    • International students
    • Executive education
    • Summer schools
  • Research
  • Faculties
    • Faculty of Engineering
    • Faculty of Medicine
    • Faculty of Natural Sciences
    • Imperial Business School
    • Administrative and support services
  • News and events
    • News
    • What's on
    • Imperial Stories
    • Great Exhibition Road Festival
    • Imperial Magazine
    • Imperial Lates
    • Graduation
  • About
    • President
    • Provost
    • Imperial Strategy
    • Academic Strategy
    • Imperial Global
    • Sustainable Imperial
    • Governance
    • Campuses
    • Our academics
    • Jobs at Imperial
  • Get involved
    • Giving
    • Schools outreach
    • Imperial Global Summer School
    • Societal engagement
    • Volunteering and outreach
    • Women at Imperial
  • Giving

User links navigation

  • For staff
  • Current students
  • Imperial for business
  • For schools
  • Alumni
Administration and support services

Capital Projects navigation

  • About us
    • Project Management
    • Engineering Team
    • Health and safety
  • Approved suppliers
  • Project procedures
    • Project stages
    • Project processes
      • Projects Delivery
        • Set up project file (Stage 0)
        • Risk Management (Stages 0 to 6)
        • Programme (Stages 0 to 5)
        • Project Execution Plan (PEP) (Stages 1 to 6)
        • Value Management (Stages 1 to 6)
        • Project reporting (Stages 1 to 7)
        • Scope of services review meeting (Stages 2 to 4)
        • Handover strategy (Stages 2 to 5)
        • Project change (Stages 2 to 6)
        • Produce project factsheet (Stage 4)
        • Risk workshop with contractor (Stage 4)
        • Client site handover (Stage 4)
        • Record document strategy (Stage 4)
        • AICW (Stage 4)
        • Valuation (Stages 4 and 5)
        • Handover (Stage 6)
        • Project close out (Stages 6 and 7)
        • Project board
      • Evaluation and approval
        • Client brief (Stage 0)
        • Project feasibility (Stage 0)
        • Estates Committee Meeting (ECM) (Stages 0, 1 and 4)
        • Project Initiation Document (Stage 1)
        • Project board approval (Stages 1 to 4)
        • TAG/ERM (Stages 1 to 4)
        • User presentation (Stages 1 to 4)
        • Record of handover (Stage 6)
        • Suppliers performance review (Stage 7)
        • Post Project Review (Stage 7)
        • Pre-feasibility (Stage 0)
      • Design Management
        • Develop design brief (Stages 0 to 4)
        • Environmental and sustainability assessment (Stages 0 to 7)
        • Prepare Stage 1 report - feasibility study (Stage 1)
        • Town planning (Stages 1 to 4)
        • Project investigations/surveys (Stages 1 to 5)
        • Licences and agreements (Stage 2)
        • Prepare Stage 2 report - concept design (Stage 2)
        • BEMS design (Stages 3 to 5)
        • NEC Supervisor duties (Stages 3 to 6)
        • Prepare Stage 3 report - developed design (Stage 3)
        • Prepare Stage 4 report - technical design (Stage 4)
        • Record document delivery (Stages 5 and 6)
        • Construction and fabrication drawings (Stage 5)
        • Testing and commissioning (Stage 6)
        • Monitor and complete defects (Stage 7)
        • Post occupancy evaluation (Stage 7)
        • Design Stage reviews
      • Cost Management
        • Prefeasibility estimate (Stage 0)
        • Budget administration (Stages 1 to 7)
        • Feasibility cost estimate (Stage 1)
        • Establish VAT and insurance (Stage 1)
        • Cost plan (Stages 2 to 3)
        • Cost reporting (Stages 4 to 6)
        • Valuations (Stages 4 and 5)
        • Post take over cost management (Stage 7)
      • Procurement Management
        • Filing consultant tender and contract documents (Stage 0)
        • Outline procurement strategy (Stages 0 and 1)
        • Design Team procurement (Stages 0 to 4)
        • Main contract - PCSA (Stage 2)
        • Two Stage tender (Stages 2 and 3)
        • Insurances (Stages 2 to 4)
        • Single Stage tender (Stage 3)
        • Novation (Stage 4)
        • File contractor tender and contract documents (Stage 4)
        • Sub-contractor review (Stage 4)
        • Main contract - NEC (Stage 4)
      • Health and safety
        • Principal Designer (Stages 0 to 6)
        • Sustainable construction (Stages 1 to 6)
        • Health, safety and environmental assessment (Stages 1 to 3)
        • F10 notification (Stages 1 and 3)
        • Induction (Stages 1 to 3)
        • Pre-construction information (Stages 1 to 4)
        • Asbestos Management (Stages 1 to 6)
        • CDM notification (Stage 2)
        • Heath and safety file (Stages 3 and 6)
        • Decontamination certificate (Stage 4)
        • Construction phase plan (Stage 4)
        • Client safety induction (Stage 4)
        • Accident and incident reporting (Stage 5)
        • Site monitoring (Stage 5)
    • Application and review
    • College roles
  • Space and Building Information
    • Space database
      • VideoPlaylist
        • Playlist 1
    • Building Information
    • Architectural Standards Library
      • Lecture Theatres
        • Architectural Standards
          • Flooring Products
          • Ceiling Products
          • Wall Products
          • Seating Products
      • Offices
        • Architectural Standards
      • Student Accommodation
        • Architectural Standards
      • Laboratories
        • Architectural Standards
          • Flooring Products
          • Ceiling Products
          • Lab Benches
          • Fume Cupboards
          • Wall Products
        • Engineering
      • Common Spaces
        • Architectural Standards
      • Signage
        • Signage
    • Estates Records
  • Resources
    • Forms
    • College standards
      • Architectural standards
    • Guides and policies
  • Construction projects
    • Current projects
    • Completed projects
      • Michael Uren Building
      • I-XHUB White City Campus
      • Reynolds Bar Charing Cross
      • ACEX Lecture Theatre
      • Multi-disciplinary Labs
    • Past projects

In this section

  • Capital Projects
  • Architectural Standards
Capital Projects
  • Imperial Home
  • Administration and support services
  • Capital Projects
  • Space and Building Information
  • Architectural Standards Library
  • Student Accommodation

Student Accommodation

Architectural Standards Library
  • Architectural Standards

Useful Links

Popular links

  • Blackboard
  • Contact the Service Desk
  • Jobs
  • Library services
  • Outlook email online

Faculties

  • Engineering
  • Medicine
  • Natural Sciences
  • Imperial Business School

Directories

  • Admin and support services
  • Networks and Centres
  • Research groups
  • Search all staff

Partners

  • Imperial College Academic Health Science Centre
  • Imperial College Health Partners
  • Imperial College Healthcare NHS Trust
  • Imperial Consultants

College Information

Imperial College London

Address

Imperial College London
South Kensington Campus
London SW7 2AZ, UK
tel: +44 (0)20 7589 5111

Facebook X, formerly known as Twitter YouTube LinkedIn Instagram TikTok TikTok

Site Information

  • Sitemap
  • Accessibility
  • Modern slavery statement
  • Privacy notice
  • Use of cookies
  • Report incorrect content
  • Log in

© 2025 Imperial College London