Approvals, Completion & Handover
Description
This section outlines the approvals and governance gateways that must be followed throughout the lifecycle of a project in order to progress to the subsequent stage, irrespective of the project's size or complexity. Any deviation from these requirements must be agreed with the relevant stakeholders, as detailed in the Engagement section below.
Two categories of approvals are required to progress through the RIBA Stages: Technical Approvals and Governance Approvals.
Technical Approvals
Technical approvals include TRM (Technical Review Meeting) and TAG (new naming to be confirmed) acceptance to proveed to the next RIBA Stage. It is important to note that the outcome of these forums, as defined within their respective process descriptions, constitutes acceptance of the proposals presented, either with or without comments. No design liability is transferred to these forums or to Imperial through this process. Full design responsibility remains with the contracted party undertaking the design work, whether consultant or contractor.
Governance Approvals
Governance approvals include STP (Situation Target Proposal) approvals and Project Board approvals. STPs are required for financial approvals and formal authorisation to proveed with the project at a central level, with requirements varying depending on the nature of the project. Certain projects may receive full funding approval from RIBA Stage 0, whereas others may require additional funding approvals at each subsequent RIBA stage. Project Board approval is required at the conclusion of each RIBA stage in order to proveed to the next stage, with formal records maintained to document the decision.
Progression to the next RIBA stage will only be considered approved once each of the independent approval streams outlined above has provided formal confirmation to proceed. In summary:
- TRM hass accepted the proposal, with or without comments;
- TAG has accepted the proposal, with or without comments;
- The Project Board has formally approved the project (including design, cost and programme) to proceed to the next stage; and
- The STP for the subsequent RIBA stage has been submitted and approved through the relevant governance forum.
Depending on the specific requirements of a project, agreements may be reached with the relevant stakeholders to combine TRM and/or TAG approvals across multiple RIBA stages. Similarly, STPs may be submitted to secure approval for full project funding, including design and/or construction costs, where appropriate.
Engagement
Engagement with the relevant stakeholders throughout the processes described above will be required in order to agree the appropriate approvals strategy, particularly where this differs from a stage-by-stage approval approach aligned to the RIBA framework. Please refer to the individual process documents for the relevant stakeholder contact details.
Forms & Links
Project Approval Tracker: PM35 Project Approval Tracker Rev1.xlsx | Powered by Box
A Project Approval Tracker has been developed to maintain a record of all approvals obtained throughout the project lifecycle. This document should be kept up to date throughout the duration of the project and retained as a reference point for audit purposes.
Description
As a project approaches completion, two distinct milestones must be achieved: Construction Completion and Handover to Building Operations, Maintenance, and/or the relevant Department.
Construction Completion is achieved once the Project Manager issues the appropriate certificate to the Main Contractor (Completion under NEC contracts or Practical Completion under JCT contracts). Guidance on the requirements for issuing this certificate can be found in the Construction Completion Checklist below. Please note that this checklist is not exhaustive and should be reviewed and tailored to the specific requriements of each project, in agreement with the Imperial Senior Supplier.
At this stage, all TAG members involved in the project should be invited to attend a site visit, providing and opportunity to inspect the completed space prior to occupation by the end users. Reasonable efforts should be made to arrange a suitable date for attendees; however, this process should not delay handover to the department or end-user group.
Handover to Property Operations, Maintenance and/or the Department will take place once the preceding steps have been completed (including issuance of the completion certificate and the TAG members' walkthrough) and the relevant Property Operations stakeholder has signed off the Handover Checklist, also referenced below. As with the Construction Completion Checklist, this document may be amended to reflect the specific conditions of the project, subject to prior agreement with the Senior Supplier and the relevant Property Operations stakeholder.
Once both stages outlined above have been completed, the project will be deemed formally handed over to Imperial.
Engagement
TAG members should be contacted with sufficient notice to arrange a single visit to the space at a time that is suitable for all attendees, or the majority available.
Relevant stakeholders from Property Operations and Maintenance play a critical role in the handover process. Project teams should liaise with the relevant Campus Director and the Maintenance Manager/Director of Maintenance to ensure a smooth and coordinated transition.
Forms & Links
- Construction Completion Checklist: TBC
- Handover Sign-Off: TBC
Supporting Documents
- Administrative
- Building Safety Act (BSA)
- Engineering, Energy, Environment (EEE)
- Finance (F)
- H&S Construction Safety Management (CSM)
- Procurement (PR)
- Project Management (PM)
- Records Management (RM)
- Space Management (SM)
- Imperial Powerpoint Template (4.3 ratio): Imperial_PPT_4.3.pptx | Powered by Box
- Imperial Powerpoint Template (16.9 ratio): Imperial_PPT_16.9.pptx | Powered by Box
- Imperial Word Document Template: Imperial_General_Word_Doc.docx | Powered by Box
- Imperial A4 Letterhead: Imperial_Letterhead_A4.docx | Powered by Box
- Imperial A4 Letterhead (no recipient): Imperial_Letterhead_A4_NO_RECIPIENT.docx | Powered by Box
- Imperial Meeting Agenda Template: Imperial_Meeting_Agenda.docx | Powered by Box
- Imperial Meeting Minutes Template: Imperial_Meeting_Minutes.docx | Powered by Box
- BSA01 Imperial Mandatory Reporting Process: BSA01 Imperial Mandatory Reporting Process Jan26.pdf | Powered by Box
- BSA02 Third Party Handover Requirements: BSA02 Building Safety Act Third Party Handover Requirements Feb26.pdf | Powered by Box
- BSA03 Change Control for Building Safety Case Submissions: BSA03 Change Control for Building Safety Case Submissions Feb26.pdf | Powered by Box
- BSA04 Accountable Persons Code of Practice: BSA04 Building Safety Act Accountable Persons COP Mar26.pdf | Powered by Box
- BSA05 HRB Construction and Acquisition Policy: BSA05 HRB Construction and Acquisition Policy Apr26.docx | Powered by Box
- EEE01 Technical Review Meeting Terms of Reference: EEE01 TRM Terms of Reference Rev2.docx | Powered by Box
- EEE02 Technical Review Meeting Agenda: EEE02 TRM Agenda Rev2.docx | Powered by Box
- EEE03 Technical Review Meeting & Technical Advisory Group Action Tracker: EEE03 TRM & TAG Action Tracker Rev2.xlsx | Powered by Box
- EEE04 Exceptions & Revisions Report (Mechanical and Electrical): EEE04 Exceptions & Revisions Report (M&E) Rev1.docx | Powered by Box
- EEE05 Room Data Sheet (Laboratory Furniture): EEE05 Room Data Sheet (Lab Furniture) Rev1.xls | Powered by Box
- EEE06 Room Data Sheet (Mechanical and Electrical): EEE06 Room Data Sheet (M&E) Rev1 .docx | Powered by Box
- EEE07 Sustainable Building Guide: EEE07 Sustainable Building Guide Rev1.pdf | Powered by Box
- EEE08 Sustainable Construction Guidelines: EEE08 Sustainable Construction Guidelines Rev1.docx | Powered by Box
- EEE09 Life Cycle Costing Report: EEE09 Life Cycle Costing Report Rev1.pdf | Powered by Box
- EEE10 BESPR 2025: EEE10 BESPR 2025 Rev10.pdf | Powered by Box
- EEE11 Mechanical and Electrical Services Site Survey Schedule: EEE11 M&E Services Site Survey Schedule Rev1.docx | Powered by Box
- EEE14 Fire & Security Alterations Form: EEE14 Fire & Security Alterations Rev1.docx | Powered by Box
- F01 Purchase Order Request Form: F01 Purchase Order Request Rev1.docx | Powered by Box
- F02 Cost Analysis: F02 Cost Analysis Rev1.xlsx | Powered by Box
- F03 Valuation Certificate: F03 Valuation Certificate Rev1.xlsx | Powered by Box
- F04 Cost Template: F04 Cost Template Rev1.xlsx | Powered by Box
- F04a Change Control (Inside Budget): F04a Change Control (Inside Budget) Rev3.xlsx | Powered by Box
- F04b Change Control (Outside Budget): *TBC
- F05 Financial Close Out Form: F05 Financial Close Out Form Rev1.xlsx | Powered by Box
- CSM01: Preconstruction Information: CSM01 Preconstruction Information Rev1.docx | Powered by Box
- CSM03 Safety Induction Agenda: CSM03 Safety Induction Agenda Rev1.doc | Powered by Box
- CSM03a Safety Induction Certificate: CSM03a Safety Induction Certificate Rev1.doc | Powered by Box
- CSM04 Principal Designer Report: CSM04 Principal Designer Report Rev1.docx | Powered by Box
- CSM05 Day One Safety Induction Form: CSM05 Day One Safety Induction Form Rev1.docx | Powered by Box
- CSM06 Accident Reporting Form: CSM06 Accident Reporting Form Rev2.docx | Powered by Box
- CSM08 Site Health & Safety Assessment: CSM08 Site H&S Assessment Rev1.docx | Powered by Box
- CSM09 F10 Notification: CSM09 F10 Notification Rev1.docx | Powered by Box
- CSM14 Roof Construction Permit: CSM14 Roof Permit Rev1.docx | Powered by Box
- CSM15 Consent to Commence Works: CSM15 Consent to Commence Works Rev1.docx | Powered by Box
- CSM17 Preconstruction H&S Checklist: CSM17 Preconstruction H&S Checklist Rev1.docx | Powered by Box
- CSM18 CDM Compliance Checklist: CSM18 CDM Compliance Checklist Rev1.docx | Powered by Box
- CSM19 Laboratory Permit to Work: CSM19 Lab Permit To Work Rev1.docx | Powered by Box
- CSM20 Equipment Decontamination Form: CSM20 Equipment Decontamination Form Rev1 .docx | Powered by Box
- CSM21 Area Clearance Decontamination Certificate: CSM21 Area Clearance Decontamination Certificate Rev1.docx | Powered by Box
- CSM22 CDM 2015 Notification: CSM22 CDM Notification Rev1.doc | Powered by Box
- CSM23 CDM Inspection Report: CSM23 CDM Inspection Report Rev1.docx | Powered by Box
- (*External document) Fume Cupboard Selection Assessment: FCS1 Fume Cupboard Chemical Safety Form Rev1.docx | Powered by Box
- PR01 Single Source Justification: PR01 Single Source Justification Rev1.docx | Powered by Box
- Pre-Qualification Questionnaire Supporting Documents: PQQ Docs | Powered by Box
- PM01 Site Handover: PM01 Site Handover Rev1.docx | Powered by Box
- PM02 Defects Certificate: PM02 Defects Certificate Rev1.doc | Powered by Box
- PM03 Defects and Outstanding Works Register: PM03 Defects & Outstanding Works Rev1.xls | Powered by Box
- PM04 Out of Hours Security Access Notification: PM04 Out of Hours Security Notice Rev2.docx | Powered by Box
- PM05 Project Closeout: PM05 Project Closeout Rev1.xlsx | Powered by Box
- PM06 Practical Completion Certificate: PM06 Practical Completion Certificate Rev1.docx | Powered by Box
- PM07 Record of Handover: PM07 Record of Handover Rev1 .docx | Powered by Box
- PM08 Early Warning Notification: PM08 Early Warning Notice Rev1.docx | Powered by Box
- PM09 Early Warning Meeting Record: PM09 Early Warning Meeting Record Rev1.docx | Powered by Box
- PM10 (PM) Notification of Compensation Event: PM10 (PM) Notification of Compensation Event Rev1.docx | Powered by Box
- PM11 (PM) Instruction NEC & JCT: PM11 (PM) Instruction NEC & JCT Rev1.docx | Powered by Box
- PM12 Takeover Certificate: PM12 Takeover Certificate Rev1.docx | Powered by Box
- PM13 Contractors Submission: PM13 Contractors Submission Rev1.docx | Powered by Box
- PM14 Post Project Review: PM14 Post Project Review Rev1.doc | Powered by Box
- PM15 STP Template: PM15 STP Template Rev6.docx | Powered by Box
- PM16 Post Project Questionnaire: PM16 Post Project Questionnaire Rev1.doc | Powered by Box
- PM17 Risk Register: PM17 Risk Register Rev2.xlsx | Powered by Box
- PM18 Post Project Guide: PM18 Post Project Guide Rev1.doc | Powered by Box
- PM20 Minor Works: PM20 Minor Works PND Rev2.docx | Powered by Box
- PM21 Project Report: PM21 Project Report Rev2.docx on Box for Microsoft 365 for Web
- PM22 Client Brief: PM22 Client Brief Rev2.docx | Powered by Box
- PM23 Exception Report: PM23 Exception Report Rev1.docx | Powered by Box
- PM24 Data Sheet Template: PM24 Data Sheet Template Rev1.docx | Powered by Box
- PM25 End of Stage Sign Off: PM25 End of Stage Sign Off Rev2.docx | Powered by Box
- PM26 Contingent Worker Set-Up: PM26 Contingent Worker Set-Up Rev1.docx | Powered by Box
- PM27 Lessons Learnt Tracker: PM27 Lessons Learnt Tracker Rev1.xlsx | Powered by Box
- PM28 POE Survey Lab Space: PM28 POE Survey Lab Space Rev1.docx | Powered by Box
- PM29 POE Survey Office Space: PM29 POE Survey Office Space Rev1.docx | Powered by Box
- PM30 POE Survey Teaching Space: PM30 POE Survey Teaching Space Rev1.docx | Powered by Box
- PM31 POE Client Feedback Survey: PM31 POE Client Feedback Survey Rev1.docx | Powered by Box
- PM32 Audience Map: PM32 Audience Map Template Rev1.pptx | Powered by Box
- PM33 Stakeholder Map: PM33 Stakeholder Map Template Rev1.xlsx | Powered by Box
- PM34 Construction Completion Checklist: PM34 Construction Completion Checklist Rev2.docx | Powered by Box
- CIBSE Building Log Book Template: CIBSE Building Log Book Template | Powered by Box
- RM02 Box Project Filing: RM02 Box Project Filing.docx | Powered by Box
- RM02b Box Minor Project Filing: RM02b Box Minor Project Filing.pdf | Powered by Box
- RM03 Property Division Box Guidelines: RM03 Property Division Box Guidelines.pdf | Powered by Box
- RM04 Divisional Records Management: RM04 Divisional Records Management.pdf | Powered by Box
- RM05 Document Destruction Form: RM05 Document Destruction Form.docx | Powered by Box
- RM06 Artefact Survey: RM06 Artefact Survey.pdf | Powered by Box
- RM06a Artefact Survey Report: RM06a Artefact Survey Report.docx | Powered by Box
- RM07 Building Fabric Manual Guide: RM07 Building Fabric Manual Guide Rev11.pdf | Powered by Box
- RM07a Building Fabric Manual Template: RM07a Building Fabric Manual Template Rev1.docx | Powered by Box
- RM08 Operations & Maintenance Manual Guide: RM08 Operations & Maintenance Manual Guide Rev11.pdf | Powered by Box
- RM09 Record Document Process Guidance: RM09 Record Document Process Guidance Rev3.pdf | Powered by Box
- RM12 Minor Works Install Record: RM12 Minor Works Install Record Rev2.docx | Powered by Box
- RM13 Minor Works Records: RM13 Minor Works Records.docx | Powered by Box
- RM14 Records Sign Off: RM14 Records Sign Off.docx | Powered by Box
- RM15 Document Transfer Form: RM15 Document Transfer Form.docx | Powered by Box
- RM16 Model Release Form: RM16 Model Release Form.docx | Powered by Box
- BIM Guidance: BIM GUIDANCE | Powered by Box
- Asset Guidance: ASSETS | Powered by Box
- Building Codes: IMP-XX-XX-SP-K-0001-BLDGDATA Master.xlsx | Powered by Box
- SM01 Space Change: SM01 Space Change Rev2.docx | Powered by Box
- SM02 Space Planning Norms: SM02 Space Planning Norms Rev1.docx | Powered by Box
- SM03 Events Risk Assessment: SM03 Events Risk Assessment Rev1.docx | Powered by Box
Guides
- South Kensington Campus: CSM16a Crane Lifting Guide SK Rev1.pdf | Powered by Box
- Charing Cross Campus: CSM16b Crane Lifting Guide CC Rev1.docx | Powered by Box
- Hammersmith Campus: CSM16c Crane Lifting Guide HM Rev1.docx | Powered by Box
- St Mary's Campus: CSM16d Crane Lifting Guide SM Rev1.pdf | Powered by Box
- Silwood Park Campus: CSM16e Crane Lifting Guide SP Rev1.docx | Powered by Box
- White City Campus: CSM16f Crane Lifting Guide WC Rev1.docx | Powered by Box
- Chemical Safety: Chemical Safety HSE guidance.pdf | Powered by Box
- Kore Access Control: Updated Kore Swipe Access Procedure 190825.msg | Powered by Box
- High Risk Building Register: HRB register.xlsx | Powered by Box
- BG6 Guide: EEE12 BG6 Proformas.xlsx | Powered by Box
- Security System Installer List: EEE13 Security System Installers.pptx | Powered by Box
Policies
- Building Safety Act Accountable Persons Code of Practice: Building Safety Act Accountable Persons COP.pdf | Powered by Box
- Change Control Process for Building Safety Case Report Submissions: Change Control for Building Safety Case Submissions.pdf | Powered by Box
- Mandatory Occurrence Reporting Process Building Safety Act: Imperial_Mandatory Reporting Process_ BSA_Jan_2026.pdf | Powered by Box
- Building Safety Act Third Party Handover Requirements: Building Safety Act Third Party Handover Requirements.pdf | Powered by Box
- Principal Designer Scope of Services (Pre-Tender): PD SoS Pre Tender Guidelines.docx | Powered by Box
- Principal Designer Scope of Services (Post-Tender): PD SoS Post Tender Guidelines.docx | Powered by Box
- Construction Health, Safety and Environment Code of Practice: Imperial Construction Code of Practice.pdf | Powered by Box
- Selection, Installation, Use, Maintenance and Decommissioning of Fume Cupboards: Imperial Fume Cupboard CoP.pdf | Powered by Box
- British Compressed Gases Association Code of Practice Publication List 2025: Chemical Safety BCGA guidance.pdf | Powered by Box
- Health and Safety Code of Practice: CSM07SafetyCOP.docx | Powered by Box
- Accident and Incident Investigations Code of Practice: HSM01-Accident-and-Incident-Investigations.pdf | Powered by Box